1. Mobilization/Demobilization
1.1 FuelRM0.90/km
1.2 Survey Vessel (KJLS MERPATI)RM3,650.00/day
2. Survey Control
2.1 Horizontal Control (15% DR)RM1,571.00/station
2.2 Vertical Control (15% DR)RM1,571.00/station
3. Sounding
3.1 Sounding (basic pattern coverage)RM326.87/km
3.2 Investigation (sandbank, wreck, etc.)RM436.00/km
3.3 Consumables (echo sounder)RM350.00/roll
4. Coastline
4.1 Seaward limit where vegetation is considered as the coastline (10% DR)RM1,047/km
4.2 Marking of tide level by wading (20% DR)RM2,095/km
5. Final Reports5 - 10% Total Cost
6. Miscellaneous (e.g. Air fare, transportation of survey team, etc.)RM1,000.00/day
7. Standby/bad weather/additional day (for surveys exceeding seven (7) days)RM10,477.00/day